Continuation of design and construction of the S19 expressway on the section from the Domaradz junction (without the junction) to the Krosno junction – previously Iskrzynia (with
Poland
Keyword found in the description
The State Treasury General Directorate for National Roads and Motorways, Wronia Street 53, 00-874 Warsaw, Conducting the proceedings: General Directorate for National Roads and Motorways, Rzeszów Bra…
- Buyer:
- State Treasury General Director of National Roads and Motorways ul. Wronia 53 00-874 Warsaw Conducting the proceedings: General Directorate for National Roads and Motorways Branch in Rzeszów 35-959 Rzeszów, ul. Legions 20
- Published:
- 5 Nov 2026
- Deadline:
- 30 Nov 2026